A. Oiling system

Installing the oil drain requires the engine to be removed from the snowmobile.

 

Remove Mag cover.

 

Hole diameter is 0.875". Ensure to drill at center or slightly offset to the outside of the cover so that your socket can be inserted to tighten the oil drain fitting.

 

 

Proper installation with enough clearance for the socket tool used to tighten the oil drain fitting. Use blue loctite prior to final assembly of the oil drain fitting.

 

Remove oem oil pressure switch.

 

Install supplied 1/8npt x -4an fitting in place of the oe oil pressure switch. Use thread sealer.

 

There are several options for the oil vent system. Simplest option is to reuse the oil vent hose and route the oil vapors outside the engine bay as per the 2 following pictures (this requires drilling a 13mm hole through the upper part of the plastic pannel.

 

 

B. Heat shields installation

Lower engine heat shield should be installed BEFORE installing the header. It should be positioned in place but not fastened until the header is completely installed and all bolts torqued to spec. Two (2) 6mm bolts secure the lower engine heat shield. Drill and prepare installation of these two bolts before installing the header.

 

Installation of valve cover heat shield after all header bolts are troqued to spec.

 

 

Turbine housing heat shield is installed last. two (2) 6mm holes will need to be drilled. Final positioning should be done only after the turbo is installed and the engine alignment is final. A minimum of 5mm is suggested between the turbine housing and the heat shield.

 

C. Intake plenum

 

Install all supplied O-Rings. Install injectors and Map sensor. For those using a BOV, instal the 3/16" vacuum fitting on the intake.

 

Install the throttle body adaptor using the 4 bolts and lock nuts supplied with the kit. Do not forget to install the adaptor with the supplied O-Ring.

 

Ensure the fuel line does not bind and/or rub against anythng that could damage it over time.

 

D. MoTeC M1 installation

This is a crucial step and extra care should be taken to route all wiring and connectors so nothing vibrates loose and there is no chafing. Completing this step in 10 minutes means something is wrong somewhere. This step should take you at least one hour. Use plenty of zip ties and check / double check for wires rubbing agains metal parts.

The M1 is installed on the tunnel as per the picture below.

 

Routing of your harness should be similar to the picture below. Connectors are located near the chaincase and should not be loose or rub against anything that could cause chafing. Mount the main relay with the supplied rivet as per below.

 

 

Mount the knock sensor using the supplied 8mm x 30mm allen bolt as per the picture below.

 

E. Final installation

Your final installation should look like the picture below if all is done propelry. Make sure to go over every details to ensure a good fit. Pay particular attention to the positioning of the intake charge tube to avoid contact between the Throttle body and the engine valve cover.

If you require to do welding on the sled while the MoTeC M1 is installed, it is imperative you disconnect the 2 main connectors while doing so.

Routing of the coolant lines to the turbo should be:

  • from stock coolant outlet on the PTO side to the turbo cooling inlet;
  • from the turbo cooling outlet to the throttle body cooling inlet (lower coolant nipple)
  • from the throttle body cooling outlet (upper coolant nipple) to the coolant bottle.

Please note this cooling circuit does not apply when installing the optional Precision's Sports auxiliary heat exhanger and cooling system.

Lastly, there are many variants for the exhaust system. Always install a flex below between the turbo outlet to the muffler. If no flex bellow is used and you use the stock muffler, then you need 2 joints, one at the turbo and one at the muffler to allow some flexing and movement. Using only one joint is a bad design, solid mounting at the turbo end, it will cause the welds to fatigue and fail on the short term.

 